AN INVESTIGATION OF THE THERMAL PERFORMANCE OF AN OIL FILLED TRANSFORMER WINDING

被引:102
作者
PIERCE, LW
MCNUTT, WJ
机构
[1] GE,DEPT TRANSFORMER,ROME,GA
[2] BERKSHIRE TRANSFORMER CONSULTANTS INC,PITTSFIELD,MA
关键词
POWER TRANSFORMER; OVERLOADING; OIL VISCOSITY; RESISTANCE CHANGE; WINDING HOTTEST SPOT; NATURAL OIL FLOW; NONDIRECTED FORCED OIL FLOW; DUCT OIL RISE;
D O I
10.1109/61.141852
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Manufacturers may be required to design transformers to overload specifications. Oil viscosity changes and loss variation with temperature are not accounted for in the industry loading guide. A comprehensive test program was performed using a winding assembly with imbedded thermocouples. Steady state and transient tests were performed for natural and non-directed forced oil circulation. The temperature distribution in the winding was not linear with height as usually assumed. A large number of temperature sensors is required to determine the hot spot location. The location of the hot spot was found to be different and less predictable for natural oil circulation compared with non-directed forced oil circulation especially during overload conditions. Improved loading guide equations were developed to account for oil viscosity, resistance change, cooling duct oil rise, and location of the hot spot.
引用
收藏
页码:1347 / 1358
页数:12
相关论文
共 13 条
[1]  
ALLEN PHG, 1973, IEE C PUB 1, V94, P83
[2]  
AUBIN J, 1989, JAN POW ENG SOC WINT
[3]   OIL-IMMERSED POWER TRANSFORMER OVERLOAD CALCULATIONS BY COMPUTER [J].
BLAKE, JH ;
KELLY, EJ .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1969, PA88 (08) :1205-&
[4]  
BURTON PJ, 1984, 30TH P CIGRE SESS, V1
[5]  
MCADAMS WH, 1954, HEAT TRANSMISSION, P167
[6]  
MONTSINGER VM, 1942, AIEE T, V61, P906
[7]  
MONTSINGER VM, 1942, AIEE T, V61, P993
[8]  
MONTSINGER VM, 1951, TRANSFORMER ENG, P306
[9]  
NORDMAN H, 1986, 31ST P CIGRE SESS, V1
[10]  
1990, PROCEDURES PERFORMIN