CAUSES OF QUALITY DEVIATIONS IN DESIGN AND CONSTRUCTION

被引:230
作者
BURATI, JL
FARRINGTON, JJ
LEDBETTER, WB
机构
[1] Clemson Univ., Clemson, SC
[2] Nat. Industrial Constructors, Birmingham, AL
[3] Pendleton, SC, 29670
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1992年 / 118卷 / 01期
关键词
D O I
10.1061/(ASCE)0733-9364(1992)118:1(34)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Quality deviation data are collected from nine fast-track industrial construction projects. The data are collected after the construction phase of the projects and identify the direct costs associated with rework (including redesign), repair, and replacement. Analyses of the data indicate that deviations on the projects accounted for an average of 12.4% of the total project costs. Furthermore, design deviations average 78% of the total number of deviations. 79% of the total deviation costs, and 9.5% of the total project cost. Construction deviations average 16% of the total number of deviations, 17% of the total deviation costs, and 2.5% of the total project cost. These values are conservative because they consider only direct costs, but they are indications of the areas that cause the greatest impact on total project costs. By applying the procedures presented in this paper to its historical records, a company can identify not only its deviation costs, but also the most likely areas on which to focus to reduce these costs on future projects.
引用
收藏
页码:34 / 49
页数:16
相关论文
共 6 条
  • [1] Burati J.L., Farrington J.J., Costs of quality deviations in design and construction, CII Source Document No. 29, (1987)
  • [2] Davis K., Ledbetter W.B., Burati J.L., Measuring design and construction quality costs, J. Constr. Engrg. and Mgmt, 115, 3, pp. 385-400, (1989)
  • [3] Diekmann J.E., Nelson M.C., Construction claims: Frequency and severity, J. Constr. Engrg. Mgmt, 111, 1, pp. 74-81, (1985)
  • [4] Ledbetter W.B., A construction industry cost effectiveness project report, Report A-6, Feb., Modern Management Systems, pp. 1-39, (1983)
  • [5] Quality: The U.S. drives to catch up, Business Week, 100, 18, pp. 66-80
  • [6] Shilstone J.M., Welcome, background and program objectives, Proc. Nat. Conference on Quality Assurance in the Bldg, pp. 1-6, (1983)