OPTIMAL HYDROTHERMAL SCHEDULING WITH CASCADED PLANTS USING PROGRESSIVE OPTIMALITY ALGORITHM

被引:28
作者
NANDA, J
BIJWE, PR
机构
来源
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS | 1981年 / 100卷 / 04期
关键词
D O I
10.1109/TPAS.1981.316486
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:2093 / 2099
页数:7
相关论文
共 10 条
  • [1] BERNHOLTZ B, 1960, AIEE T 3, V79, P921
  • [2] BIJWE PR, 1977, SUM IEEE PES M
  • [3] OPTIMAL SCHEDULING OF HYDRO-THERMAL POWER-SYSTEMS
    BONAERT, AP
    ELABIAD, AH
    KOIVO, AJ
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1972, PA91 (01): : 263 - &
  • [4] OPTIMAL SOLUTION TO HYDRO-STEAM DISPATCH PROBLEM FOR CERTAIN PRACTICAL SYSTEMS
    DAHLIN, EB
    SHEN, DWC
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1966, PA85 (05): : 437 - +
  • [5] DRAKE HH, 1962, AIEE T PAS, V81, P242
  • [6] NEW ALGORITHM FOR SOLUTION OF MULTISTATE DYNAMIC-PROGRAMMING PROBLEMS
    HOWSON, HR
    SANCHO, NGF
    [J]. MATHEMATICAL PROGRAMMING, 1975, 8 (01) : 104 - 116
  • [7] NAGRATH IJ, 1976, J IE ELECTRICAL, V56
  • [8] RAO KSP, 1974, THESIS IIT KANPUR
  • [9] RAO KSP, 1974, WIN IEEE PES M
  • [10] NEW APPROACH TO MODIFIED COORDINATION EQUATIONS FOR ECONOMIC LOAD DISPATCH
    WADHWA, CL
    NANDA, J
    [J]. PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1976, 123 (09): : 923 - 925