A MULTIPLE-PASS HEURISTIC RULE FOR JOB-SHOP SCHEDULING WITH DUE-DATES

被引:17
作者
HE, Z [1 ]
YANG, T [1 ]
DEAL, DE [1 ]
机构
[1] UNIV HOUSTON,DEPT IND ENGN,4800 CALHOUN RD,HOUSTON,TX 77204
关键词
D O I
10.1080/00207549308956890
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents an efficient multiple-pass heuristic algorithm for job shop scheduling problems with due dates wherein the objective is to minimize total job tardiness. Algorithm operation is carried out in two phases. In phase 1 a dispatching rule is employed to generate an active or non-delay initial schedule. In phase 2, tasks selected from a predetermined set of promising target operations in the initial schedule are tested to ascertain whether by left-shifting their start times and rearranging some subset of the remaining operations one can reduce total tardiness. Performance evaluation is carried out over a range of shop sizes focusing, first of all, on the quality of the initial schedule produced through five commonly used dispatching rules and, secondly, the schedule improvement achieved with the multiple-pass heuristic. Results indicate that the proposed technique is capable of yielding notable reductions in total tardiness (over initial schedules) for practical size problems and would suggest that the approach presents an efficient scheduling option for this class of complex optimization problems.
引用
收藏
页码:2677 / 2692
页数:16
相关论文
共 22 条
[1]  
Anderson E.J., Nyirenda J.C., Two new rules to minimize tardiness in a job shop, International Journal of Production Research, 28, pp. 2277-2292, (1990)
[2]  
Baker K.R., Introduction to Sequencing and Scheduling, (1974)
[3]  
Baker K.R., Sequencing rules and due-date assignments in a job shop, Management Science, 30, pp. 1093-1104, (1984)
[4]  
Baker K.R., Kanet J.J., Job shop scheduling with modified due dates, Journal of Operations Management, 4, pp. 11-21, (1983)
[5]  
Bertrand J., The effect of workloads dependent due-dates on job shop performance, Management Science, 29, pp. 799-816, (1983)
[6]  
Carroll D.C., Heuristic Sequencing of Single and Multiple Component Jobs, (1965)
[7]  
Conway R.W., Priority dispatching and job lateness in a job shop, Journal of Industrial Engineering, 29, pp. 228-237, (1965)
[8]  
Conway R.W., Maxwell W.L., Miller L.W., Theory of Scheduling, (1967)
[9]  
Eglese R.W., Simulated annealing: A tool for operational research, European Journal of Operational Research, 46, pp. 271-281, (1990)
[10]  
Eilon S., Hodgson R.M., Job shop scheduling with due dates, International Journal of Production Research, 6, pp. 1-13, (1967)