共 9 条
[1]
Bellman R. E., 1962, APPL DYNAMIC PROGRAM
[2]
Bertele Umberto, 1972, NONSERIAL DYNAMIC PR
[3]
Burgess A.R., 1962, J IND ENG, V13, P76
[4]
RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1989, 115 (02)
:302-316
[6]
PACKING METHOD FOR RESOURCE LEVELING (PACK)
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1990, 116 (02)
:331-350
[7]
Moder J. J., 1983, PROJECT MANAGEMENT C
[8]
TIME-CONSTRAINED RESOURCE LEVELING
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1991, 117 (03)
:503-520