OPTIMAL RESOURCE LEVELING USING NON-SERIAL DYNAMIC-PROGRAMMING

被引:71
作者
BANDELLONI, M
TUCCI, M
RINALDI, R
机构
[1] Energy Engineering Department, University of Florence, Florence
关键词
Computational complexity - Computational methods - Dynamic programming - Heuristic methods - Mathematical models - Operations research - Optimization;
D O I
10.1016/0377-2217(94)90380-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A recurring problem in managing project activities is to minimize the deviation between the resource requirements and stated desirable levels. This paper presents a new optimizing approach for resource leveling based on non-serial dynamic programming. This approach permits a marked reduction of the complexity of the problem as it checks for only the feasible time subsets which are far less numerous than feasible sequences. The model, which is applied to an activity-on-node network, requires as input the scheduling results provided by the critical path method (CPM). Applications of the model to two opposite cases are also described and the solutions compared with the ones achieved by the Burges and Killebrew heuristic. Computational results indicate that the procedure provides exact solutions for small to medium size problems, requiring only modest computing facilities.
引用
收藏
页码:162 / 177
页数:16
相关论文
共 9 条
[1]  
Bellman R. E., 1962, APPL DYNAMIC PROGRAM
[2]  
Bertele Umberto, 1972, NONSERIAL DYNAMIC PR
[3]  
Burgess A.R., 1962, J IND ENG, V13, P76
[4]   RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION [J].
EASA, SM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (02) :302-316
[5]   ON THE MEASUREMENT OF COMPLEXITY IN ACTIVITY NETWORKS [J].
ELMAGHRABY, SE ;
HERROELEN, WS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1980, 5 (04) :223-234
[6]   PACKING METHOD FOR RESOURCE LEVELING (PACK) [J].
HARRIS, RB .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (02) :331-350
[7]  
Moder J. J., 1983, PROJECT MANAGEMENT C
[8]   TIME-CONSTRAINED RESOURCE LEVELING [J].
SEIBERT, JE ;
EVANS, GW .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (03) :503-520
[9]   OPTIMAL RESOURCE PROFILES FOR PROGRAM SCHEDULING [J].
TAVARES, LV .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (01) :83-90