THE PERFORMANCE OF ROLLING PRODUCTION SCHEDULES IN A PROCESS INDUSTRY

被引:25
作者
DEMATTA, R [1 ]
GUIGNARD, M [1 ]
机构
[1] UNIV PENN,WHARTON SCH,DEPT OPERAT & INFORMAT MANAGEMENT,PHILADELPHIA,PA 19104
关键词
D O I
10.1080/07408179508936772
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we study lot-sizing and changeover decisions in production schedules that are implemented on a rolling-horizon basis. The study is carried out by comparing production schedules for the packaging operations of a pharmaceutical company that produces various products on several capacitated production lines. The schedules are obtained by solving a mixed-integer programming formulation by using a heuristic procedure. We examine the effects of the number of periods in the planning horizon, the starting inventory and the demand fluctuation on the schedules. We show empirically that the saving in annual production cost diminishes rapidly as more demand periods are added to the planning horizon. Computational results are reported.
引用
收藏
页码:564 / 573
页数:10
相关论文
共 29 条
[1]  
Baker KennethR., 1977, DECISION SCI, V8, P19, DOI [DOI 10.1111/J.1540-5915.1977.TB01065.X, 10.1111/j.1540-5915.1977.tb01065.x]
[2]  
BITRAN GR, 1981, MANAGE SCI, V28, P1174
[3]  
Camerini P.M., 1975, MATH PROGRAMMING STU, P26, DOI DOI 10.1007/BFB0120697
[4]   ECONOMIC LOT SCHEDULING FOR MULTIPLE PRODUCTS ON PARALLEL IDENTICAL PROCESSORS [J].
CARRENO, JJ .
MANAGEMENT SCIENCE, 1990, 36 (03) :348-358
[5]   STUDYING THE EFFECTS OF PRODUCTION LOSS DUE TO SETUP IN DYNAMIC PRODUCTION SCHEDULING [J].
DEMATTA, R ;
GUIGNARD, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 72 (01) :62-73
[6]   DYNAMIC PRODUCTION SCHEDULING FOR A PROCESS INDUSTRY [J].
DEMATTA, R ;
GUIGNARD, M .
OPERATIONS RESEARCH, 1994, 42 (03) :492-503
[7]  
Dixon P, 1981, J OPERATIONS MANAGEM, V2, P23
[8]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771
[9]   OPTIMAL PROGRAMMING OF LOT SIZES, INVENTORY AND LABOR ALLOCATIONS [J].
DZIELINSKI, BP ;
GOMORY, RE .
MANAGEMENT SCIENCE, 1965, 11 (09) :874-890
[10]   SHORT-TERM SCHEDULING FOR MULTIPRODUCT BATCH CHEMICAL-PLANTS [J].
EGLI, UM ;
RIPPIN, DWT .
COMPUTERS & CHEMICAL ENGINEERING, 1986, 10 (04) :303-325