ON SINGLE-MACHINE SCHEDULING WITH PRECEDENCE RELATIONS AND LINEAR OR DISCOUNTED COSTS

被引:19
作者
GLAZEBROOK, KD [1 ]
GITTINS, JC [1 ]
机构
[1] UNIV OXFORD,OXFORD,ENGLAND
关键词
D O I
10.1287/opre.29.1.161
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Some results of J. B. Sidney concerning order-constrained deterministic scheduling with linear costs are extended to the more complex discounted costs case. Further, certain order-constrained stochastic scheduling problems are shown to have optimal strategies which are nonpreemptive. When this is so, results for the deterministic case may be utilized to obtain these optimal strategies. The models discussed are of interest in computer and jobshop scheduling and research planning.
引用
收藏
页码:161 / 173
页数:13
相关论文
共 13 条
[1]  
[Anonymous], 1973, DISCRETE MATH
[2]  
Bruno J., 1975, SIAM Journal on Computing, V4, P478, DOI 10.1137/0204041
[3]  
GITTINS JC, 1979, J ROY STAT SOC B MET, V41, P148
[4]  
GITTINS JC, UNPUBLISHED
[5]   STOCHASTIC SCHEDULING WITH ORDER CONSTRAINTS [J].
GLAZEBROOK, KD .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1976, 7 (06) :657-666
[6]   OPTIMAL STRATEGIES FOR A CLASS OF CONSTRAINED SEQUENTIAL PROBLEMS [J].
KADANE, JB ;
SIMON, HA .
ANNALS OF STATISTICS, 1977, 5 (02) :237-255
[7]  
Meilijson I., 1977, STOCHASTIC PROCESSES, V5, P195
[8]  
Monma C. L., 1979, Mathematics of Operations Research, V4, P215, DOI 10.1287/moor.4.3.215
[9]   ALGORISTICS FOR SINGLE-MACHINE SEQUENCING WITH PRECEDENCE CONSTRAINTS [J].
MORTON, TE ;
DHARAN, BG .
MANAGEMENT SCIENCE, 1978, 24 (10) :1011-1020
[10]   HAMILTONIAN APPROACH TO OPTIMAL STOCHASTIC RESOURCE-ALLOCATION [J].
NASH, P ;
GITTINS, JC .
ADVANCES IN APPLIED PROBABILITY, 1977, 9 (01) :55-68