ON THE PRODUCTION CAPACITY OF AUTOMATIC TRANSFER LINES WITH UNLIMITED BUFFER SPACE

被引:9
作者
SHANTHIKUMAR, JG
机构
来源
AIIE TRANSACTIONS | 1980年 / 12卷 / 03期
关键词
D O I
10.1080/05695558008974517
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:273 / 274
页数:2
相关论文
共 10 条
[1]  
BUXEY GM, 1973, AIIE T, V5
[2]   MODELS OF AUTOMATIC TRANSFER LINES WITH INVENTORY BANKS - REVIEW AND COMPARISON [J].
BUZACOTT, JA ;
HANIFIN, LE .
AIIE TRANSACTIONS, 1978, 10 (02) :197-207
[3]  
BUZACOTT JA, 1967, INT J PROD RES, V5, P183, DOI DOI 10.1080/00207546708929751
[4]  
GERSHWIN SB, 1979, ESLFR8349 MASS I TEC
[5]  
Ignall E., 1977, AIIE Transactions, V9, P183, DOI 10.1080/05695557708975141
[6]   STABILITY OF A QUEUE WITH NON-INDEPENDENT INTER-ARRIVAL AND SERVICE TIMES [J].
LOYNES, RM .
PROCEEDINGS OF THE CAMBRIDGE PHILOSOPHICAL SOCIETY, 1962, 58 (JUL) :497-&
[7]  
MASSO S, 1974, AIIE T, V6, P354
[8]  
Okamura K., 1977, AIIE Transactions, V9, P127, DOI 10.1080/05695557708975134
[9]  
Sheskin T.J., 1976, AIEE T, V8, P146
[10]   SOME COMPARATIVE AND DESIGN ASPECTS OF FIXED CYCLE PRODUCTION SYSTEMS [J].
SOYSTER, AL ;
TOOF, DI .
NAVAL RESEARCH LOGISTICS, 1976, 23 (03) :437-454