SCHEDULING CYCLIC PRODUCTION ON SEVERAL IDENTICAL MACHINES

被引:12
作者
MAXWELL, WL [1 ]
SINGH, H [1 ]
机构
[1] DUPONT CO,WILMINGTON,DE 19898
关键词
D O I
10.1287/opre.34.3.460
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:460 / 463
页数:4
相关论文
共 15 条
[1]   LOT SIZING AND SEQUENCING FOR N-PRODUCTS ON ONE FACILITY [J].
DELPORTE, CM ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1977, 23 (10) :1070-1079
[2]   ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
DOLL, CL ;
WHYBARK, DC .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :50-55
[3]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[4]  
FERRERIA SE, 1973, AIIE T, V5, P237
[5]  
FUJITA S, 1978, AIIE T, V10
[6]  
Golumbic M. C., 1980, ALGORITHMIC GRAPH TH
[7]  
GONZALEZ MJ, 1970, IEEE T AEROSPACE ELE, V12
[8]   SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
HAESSLER, RW ;
HOGUE, SL .
MANAGEMENT SCIENCE, 1976, 22 (08) :909-912
[9]  
HAUSSMAN F, 1962, OPERATIONS RES PRODU
[10]  
HSU WL, 1983, MGMT SCI, V29