共 16 条
[1]
Kolen A., Rinnooy Kan A., Trienekens H., Vehicle routing with time windows, Operations Research, 35, 2, pp. 266-273, (1987)
[2]
Koskosidis Y.A., Powell W.B., Solomon M.M., An optimization-based heuristic for vehicle routing and scheduling with soft time window constraints, Transportation Science, 26, 2, pp. 69-85, (1992)
[3]
Lei L., Wang T.J., The minimum common-cycle algorithm for cyclic scheduling of two material handling hoists with time window constraints, Management Science, 37, 12, pp. 1629-1639, (1991)
[4]
Liang T.P., Moskowitz H., Yih Y., Integrating neural networks and semi-Markov processes for automated knowledge acquisition: An application to real-time scheduling, Decision Sciences, 23, 6, pp. 1297-1313, (1992)
[5]
Matsuo H., Shang J.S., Sullivan R.S., A crane scheduling problem in a computer-integrated manufacturing environment, Management Science, 37, 5, pp. 587-606, (1991)
[6]
Phillips L.W., Unger P.S., Mathematical programming solution of a hoist scheduling program, Aile Transactions, 28, 2, pp. 219-225, (1976)
[7]
Savelsbergh M., Local Search in Routing Problems with Time Windows, (1984)
[8]
Shapiro G.W., Nuttle H., Hoist scheduling for a PCB electroplating facility, IIE Transactions, 20, 2, pp. 157-167, (1988)
[9]
Solomon M., On the worst-case performance of some heuristics for the vehicle routing and scheduling problem with time window constraints, Networks, 16, pp. 161-174, (1986)
[10]
Solomon M., Algorithms for the vehicle routing and scheduling problems with time window constraints, Operations Research, 35, 2, pp. 254-265, (1987)