A MATHEMATICAL-PROGRAMMING APPROACH TO A DETERMINISTIC KANBAN SYSTEM

被引:88
作者
BITRAN, GR [1 ]
LI, C [1 ]
机构
[1] IBM CORP,POUGHKEEPSIE,NY 12602
关键词
D O I
10.1287/mnsc.33.4.427
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:427 / 441
页数:15
相关论文
共 9 条
[1]   MULTISTAGE PRODUCTION PLANNING [J].
GABBAY, H .
MANAGEMENT SCIENCE, 1979, 25 (11) :1138-1148
[2]   DESIGN AND ANALYSIS OF PULL SYSTEM, A METHOD OF MULTISTAGE PRODUCTION CONTROL [J].
KIMURA, O ;
TERADA, H .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (03) :241-253
[3]  
KRAJEWSKI LJ, 1983, WORKING PAPER SERIES, V8319
[4]  
MONDEN Y, 1981, IND ENG, V13, P22
[5]  
MONDEN Y, 1981, IND ENG, V13, P42
[6]  
MONDEN Y, 1981, IND ENG, V13, P36
[7]  
Rice J. W., 1982, PRODUCTION INVENTORY, V23, P1
[8]  
SCHONBERGER RICHARD J., 1982, JAPANESE MANUFACTURI
[9]   TOYOTA PRODUCTION SYSTEM AND KANBAN SYSTEM MATERIALIZATION OF JUST-IN-TIME AND RESPECT-FOR-HUMAN SYSTEM [J].
SUGIMORI, Y ;
KUSUNOKI, K ;
CHO, F ;
UCHIKAWA, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1977, 15 (06) :553-564