共 11 条
[1]
Baker K., 1974, INTRO SEQUENCING SCH
[2]
SCHEDULING WITH EARLIEST START AND DUE DATE CONSTRAINT
[J].
NAVAL RESEARCH LOGISTICS QUARTERLY,
1971, 18 (04)
:511-&
[3]
Dantzig G.B., 1954, NAV RES LOGIST Q, V1, P217, DOI 10.1002/(ISSN)1931-919310.1002/nav.v1:310.1002/nav.3800010309
[4]
DANTZIG GB, 1956, LINEAR INEQUALITIES, V38, P207
[6]
ELMAGHRABY SE, 1962, DESIGN PRODUCTION SY
[7]
FONG CO, 1973, WP7222 U ROCH GRAD S
[8]
Ford Lester R., 1962, FLOWS NETWORKS
[9]
Fulkerson D.R., 1956, P AM MATH SOC, V7, P701, DOI DOI 10.2307/2033375
[10]
FULKERSON DR, 1972, PERSPECTIVE OPTIMIZA, P197