GAS HOLDUP IN A 2-PHASE VERTICAL TUBULAR REACTOR AT HIGH-PRESSURE

被引:18
作者
DEBRUIJN, TJW
CHASE, JD
DAWSON, WH
机构
[1] CANMET, Ottawa, Can, CANMET, Ottawa, Can
关键词
D O I
10.1002/cjce.5450660223
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
9
引用
收藏
页码:330 / 333
页数:4
相关论文
共 9 条
[1]  
Bach H., 1978, GER CHEM ENG, V1, P270
[2]  
HEIJNEN K, 1984, CHEM ENG J, V28, pB21
[3]  
LILEY PE, 1973, CHEM ENG HDB, pCH3
[4]   HYDRODYNAMICS OF BUBBLE-COLUMNS IN THE UNIFORM BUBBLING REGIME [J].
MOLERUS, O ;
KURTIN, M .
CHEMICAL ENGINEERING SCIENCE, 1985, 40 (04) :647-652
[5]   A CORRELATION FOR GAS HOLDUP IN TURBULENT COALESCING BUBBLE-COLUMNS [J].
REILLY, IG ;
SCOTT, DS ;
DEBRUIJN, T ;
JAIN, A ;
PISKORZ, J .
CANADIAN JOURNAL OF CHEMICAL ENGINEERING, 1986, 64 (05) :705-717
[6]  
REILLY IG, 1986, 3 WORLD C CHEM ENG T
[7]  
REILLY IG, 1987, UNPUB
[8]   DESIGN PARAMETERS ESTIMATIONS FOR BUBBLE COLUMN REACTORS [J].
SHAH, YT ;
KELKAR, BG ;
GODBOLE, SP ;
DECKWER, WD .
AICHE JOURNAL, 1982, 28 (03) :353-379
[9]  
[No title captured]