PLANNING AND SCHEDULING FOR EPITAXIAL WAFER PRODUCTION FACILITIES

被引:22
作者
BITRAN, GR [1 ]
TIRUPATI, D [1 ]
机构
[1] UNIV TEXAS,AUSTIN,TX 78712
关键词
D O I
10.1287/opre.36.1.34
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:34 / 49
页数:16
相关论文
共 19 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]   EXPERIMENTAL COMPARISON OF SOLUTION ALGORITHMS FOR SINGLE-MACHINE TARDINESS PROBLEM [J].
BAKER, KR ;
MARTIN, JB .
NAVAL RESEARCH LOGISTICS, 1974, 21 (01) :187-199
[3]  
BERNARDO JJ, 1984, J OPS MGMT, V4, P305
[4]  
Bitran G., 1977, DECISION SCI, V8, P28, DOI 10.1111/j.1540-5915.1977.tb01066.x
[5]  
BRADLEY SP, 1977, APPLIED MATH PROGRAM
[6]  
Conway R, 1967, THEORY SCHEDULING
[7]   ALGORITHMS FOR SCHEDULING TASKS ON UNRELATED PROCESSORS [J].
DAVIS, E ;
JAFFE, JM .
JOURNAL OF THE ACM, 1981, 28 (04) :721-736
[8]   PREEMPTIVE SCHEDULING OF UNIFORM MACHINES BY ORDINARY NETWORK FLOW TECHNIQUES [J].
FEDERGRUEN, A ;
GROENEVELT, H .
MANAGEMENT SCIENCE, 1986, 32 (03) :341-349
[9]   LEXICOGRAPHICALLY OPTIMAL BASE OF A POLYMATROID WITH RESPECT TO A WEIGHT VECTOR [J].
FUJISHIGE, S .
MATHEMATICS OF OPERATIONS RESEARCH, 1980, 5 (02) :186-196
[10]  
Hax A.C., 1978, HDB OPERATIONS RES