SCHEDULING CHAIN-STRUCTURED TASKS TO MINIMIZE MAKESPAN AND MEAN FLOW TIME

被引:64
作者
DU, JZ
LEUNG, JYT
YOUNG, GH
机构
[1] Computer Science Program, University of Texas at Dallas, Richardson, Texas
关键词
D O I
10.1016/0890-5401(91)90009-Q
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
We consider the problem of scheduling a set of chains onm 〉 1 identical processors with the objectives of minimizing the makespan and the mean flow time. We show that finding a nonpreemptive schedule with the minimum makespan is strongly NP-hard for each fixedm 〉 1, answering the open question of whether this problem is strongly NP-hard for trees. We also show that finding a nonpreemptive schedule with the minimum mean flow time is strongly NP-hard for each fixedm 〉 1, improving the known strong NP-hardness results for in-trees and out-trees. Finally, we generalize the result of McNaughton, showing that preemption cannot reduce the mean weighted flow time for a set of chains. The last two results together imply that finding a preemptive schedule with the minimum mean flow time is also strongly NP-hard for each fixedm 〉 1, answering another open question on the complexity of this problem for trees. © 1991, Academic Press, Inc.. All rights reserved.
引用
收藏
页码:219 / 236
页数:18
相关论文
共 8 条
[1]   SCHEDULING INDEPENDENT TASKS TO REDUCE MEAN FINISHING TIME [J].
BRUNO, J ;
COFFMAN, EG ;
SETHI, R .
COMMUNICATIONS OF THE ACM, 1974, 17 (07) :382-387
[2]  
Conway RW., 1967, THEORY SCHEDULING
[3]  
Garey M.R., 1979, COMPUTERS INTRACTABI, V174
[4]  
LAGEWEG BJ, 1981, BW138 MATH CTR REP
[5]  
Lawler EL, 1978, ANN DISCRETE MATH, V2, P75
[6]   SCHEDULING WITH DEADLINES AND LOSS FUNCTIONS [J].
MCNAUGHTON, R .
MANAGEMENT SCIENCE, 1959, 6 (01) :1-12
[7]   PREEMPTIVE SCHEDULING OF REAL-TIME TASKS ON MULTIPROCESSOR SYSTEMS [J].
MUNTZ, RR ;
COFFMAN, EG .
JOURNAL OF THE ACM, 1970, 17 (02) :324-&
[8]   ON THE COMPLEXITY OF MEAN FLOW TIME SCHEDULING. [J].
Sethi, Ravi .
Mathematics of Operations Research, 1977, 2 (04) :320-330