共 9 条
[1]
OPTIMUM DESIGN OF MULTIPURPOSE CHEMICAL-PLANTS
[J].
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT,
1979, 18 (02)
:343-348
[2]
LASDON LS, 1978, CIS7801 CLEV STAT U
[3]
MINIMIZATION OF CAPITAL INVESTMENT FOR BATCH PROCESSES - CALCULATION OF OPTIMUM EQUIPMENT SIZES
[J].
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT,
1970, 9 (04)
:625-&
[4]
MAUDERLI AM, 1979, THESIS TH ZURICH
[5]
GASP-IV AND SIMULATION OF BATCH-SEMICONTINUOUS OPERATIONS - PARALLEL TRAIN PROCESS
[J].
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT,
1978, 17 (02)
:166-175
[6]
CHOICE OF EQUIPMENT SIZES FOR MULTIPRODUCT BATCH PLANTS - HEURISTICS VS BRANCH AND BOUND
[J].
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT,
1975, 14 (03)
:197-203
[7]
SPARROW RE, 1974, CHEM ENG, V289, P520
[9]
SUHAMI I, 1980, THESIS NW U EVANSTON