MULTIPLE RESOURCE - CONSTRAINED SCHEDULING USING BRANCH AND BOUND

被引:144
作者
STINSON, JP
DAVIS, EW
KHUMAWALA, BM
机构
[1] UNIV HOUSTON,HOUSTON,TX 77004
[2] UNIV VIRGINIA,CHARLOTTESVILLE,VA 22906
来源
AIIE TRANSACTIONS | 1978年 / 10卷 / 03期
关键词
D O I
10.1080/05695557808975212
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:252 / 259
页数:8
相关论文
共 16 条
[1]   EFFICIENT BRANCH AND BOUND ALGORITHM FOR CAPACITATED WAREHOUSE LOCATION PROBLEM [J].
AKINC, U ;
KHUMAWALA, BM .
MANAGEMENT SCIENCE, 1977, 23 (06) :585-594
[2]  
ASHOUR S, 1974, AIIE T, V3, P62
[3]  
BENNINGTON GE, 1972, 81 N CAR STAT U REP
[4]  
Dannenbring D. G., 1973, AIIE Transactions, V5, P265, DOI 10.1080/05695557308974911
[5]  
Davis E. W., 1973, AIIE T, V5, P297
[6]  
DAVIS EW, 1971, MANAGE SCI B-APPL, V17, pB803
[7]   ON RESOURCE ALLOCATION IN PROJECT NETWORKS [J].
HASTINGS, NA .
OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (02) :217-&
[8]  
Johnson TJR, 1967, THESIS MASSACHUSETTS
[9]  
Katsoulas P. C., 1976, AIIE Transactions, V8, P226, DOI 10.1080/05695557608975071
[10]  
KHUMAWALA BM, 1972, MANAGEMENT SCI, V28, P12