DYNAMIC DECISIONS AND WORK LOAD IN MULTITASK SUPERVISORY CONTROL

被引:70
作者
TULGA, MK
SHERIDAN, TB
机构
[1] MIT, DEPT MECH ENGN, CAMBRIDGE, MA 02139 USA
[2] MIT, MAN MACHINE SYST LAB, CAMBRIDGE, MA 02139 USA
来源
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS | 1980年 / 10卷 / 05期
关键词
D O I
10.1109/TSMC.1980.4308481
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:217 / 232
页数:16
相关论文
共 36 条
[1]  
BELLMAN RE, 1970, MANAGE SCI B-APPL, V17, pB141
[2]  
Bryson A.E, 1975, APPL OPTIMAL CONTROL
[3]   A QUEUEING MODEL OF MANY-INSTRUMENT VISUAL SAMPLING [J].
CARBONEL.JR .
IEEE TRANSACTIONS ON HUMAN FACTORS IN ELECTRONICS, 1966, HFE7 (04) :157-+
[4]  
ELMAGHRABY SE, 1968, J IND ENGINEERING, V19, P105
[5]  
Gelb A, 1992, APPL OPTIMAL ESTIMAT
[6]   DETERMINISTIC NETWORK OPTIMIZATION - BIBLIOGRAPHY [J].
GOLDEN, BL ;
MAGNANTI, TL .
NETWORKS, 1977, 7 (02) :149-183
[7]  
HARARY F, 1973, NEW DIRECTIONS THEOR
[8]   DYNAMIC SCHEDULING OF A MULTICLASS QUEUE - DISCOUNT OPTIMALITY [J].
HARRISON, JM .
OPERATIONS RESEARCH, 1975, 23 (02) :270-282
[9]   A DYNAMIC PROGRAMMING APPROACH TO SEQUENCING PROBLEMS [J].
HELD, M ;
KARP, RM .
JOURNAL OF THE SOCIETY FOR INDUSTRIAL AND APPLIED MATHEMATICS, 1962, 10 (01) :196-210
[10]  
Johnson D., 1973, THESIS MASSACHUSETTS