共 16 条
- [1] Charpentier J. C., 1976, Chemical Engineering Journal, V11, P161, DOI 10.1016/0300-9467(76)80038-X
- [5] SCALE UP OF PILOT-PLANT DATA FOR CATALYTIC HYDROPROCESSING [J]. INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1973, 12 (03): : 328 - 334
- [7] Mears D. E., 1974, ADV CHEM SER, V133, P218
- [8] Midoux N., 1976, J CHEM ENG JAPAN, V9, P350, DOI [10.1252/jcej.9.350, DOI 10.1252/JCEJ.9.350]
- [9] EFFECT OF HOLDUP INCOMPLETE CATALYST WETTING AND BACKMIXING DURING HYDROPROCESSING IN TRICKLE BED REACTORS [J]. INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1975, 14 (03): : 315 - 322
- [10] Sato Y., 1973, J CHEM ENG JPN, V6, P147