THE EFFECT OF SAMPLE-SIZE ON ESTIMATED LIMITS FOR (X)OVER-BAR AND X-CONTROL CHARTS

被引:252
作者
QUESENBERRY, CP
机构
关键词
ARL; ESTIMATED LIMITS; Q CHARTS; SAMPLE SIZE; SDRL; X CHARTS; (X)OVER-BAR CHARTS;
D O I
10.1080/00224065.1993.11979470
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The results of this study indicate that (X) over bar charts with subgroups of size n require about 400/(n-1) samples, and X charts require about 300 values to estimate control limits that perform like known limits. The results also indicate that using estimated control limits results in charts for which the events that individual points exceed the control limits are dependent. One result of this dependence in a charting program is to increase the rate of false alarms after short runs, even though the ARL is increased. The implications of this to the use of Q charts are discussed.
引用
收藏
页码:237 / 247
页数:11
相关论文
共 5 条
[1]  
[Anonymous], 1974, QUALITY CONTROL IND
[2]  
Hillier F. S., 1969, J QUAL TECHNOL, V1, P17, DOI 10.1080/00224065.1969.11980343
[3]   THE SHEWHART CONTROL CHART - TESTS FOR SPECIAL CAUSES [J].
NELSON, LS .
JOURNAL OF QUALITY TECHNOLOGY, 1984, 16 (04) :237-239
[4]  
Proschan F, 1960, IND QUALITY CONTROL, V17, P12
[5]  
QUESENBERRY CP, 1991, J QUAL TECHNOL, V23, P231