COMPUTATIONAL EXPERIENCE WITH A BACKTRACKING ALGORITHM FOR SOLVING A GENERAL-CLASS OF PRECEDENCE AND RESOURCE-CONSTRAINED SCHEDULING PROBLEMS

被引:81
作者
PATTERSON, JH
TALBOT, FB
SLOWINSKI, R
WEGLARZ, J
机构
[1] UNIV MICHIGAN,ANN ARBOR,MI 48109
[2] POZNAN TECH UNIV,PL-60965 POZNAN,POLAND
关键词
PROJECT MANAGEMENT; RESOURCE-CONSTRAINED SCHEDULING; BRANCH AND BOUND; INTEGER PROGRAMMING; NET PRESENT VALUE;
D O I
10.1016/0377-2217(90)90121-Q
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper computational results are presented with a very general, yet powerful backtracking procedure for solving the duration minimization and net present value maximization problems in a precedence and resource-constrained network. These networks are generally of the PERT/CPM variety, although it is not required that they be so. Among the advantages cited for our approach are low computer memory (storage) requirements and the ability to obtain improved solutions rapidly (heuristic properties). Since the resource-constrained project scheduling problem subsumes the job shop, flow shop, assembly line balancing, and related scheduling problems, our procedure can be used with little or no modification to solve a wide variety of problem types. Computational experience is reported for both mainframe and personal computer implementations.
引用
收藏
页码:68 / 79
页数:12
相关论文
共 22 条
[1]  
Blaewicz J., 1986, SCHEDULING RESOURCE
[2]  
Davis E. W., 1973, AIIE T, V5, P297
[3]  
DAVIS EW, 1971, MANAGE SCI B-APPL, V17, pB803
[4]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[5]  
DAVIS EW, 1968, THESIS YALE U
[6]   SCHEDULING A PROJECT TO MAXIMIZE ITS PRESENT VALUE - ZERO-ONE PROGRAMMING APPROACH [J].
DOERSCH, RH ;
PATTERSON, JH .
MANAGEMENT SCIENCE, 1977, 23 (08) :882-889
[7]  
ELMAGHRABY SE, 1977, ACTIVITY NETWORKS PR
[8]   DYNAMIC-PROGRAMMING ALGORITHM FOR DECISION CPM NETWORKS [J].
HINDELANG, TJ ;
MUTH, JF .
OPERATIONS RESEARCH, 1979, 27 (02) :225-241
[9]  
Patterson J. H., 1976, AIIE Transactions, V8, P449, DOI 10.1080/05695557608975107
[10]   HORIZON-VARYING, ZERO-ONE APPROACH TO PROJECT SCHEDULING [J].
PATTERSON, JH ;
HUBER, WD .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (06) :990-998