ECONOMIC MANUFACTURING QUANTITY IN A JUST-IN-TIME DELIVERY SYSTEM

被引:71
作者
GOLHAR, DY
SARKER, BR
机构
[1] Department of Management, Haworth College of Business, Western Michigan University, Kalamazoo, MI
[2] Department of Industrial and Manufacturing Systems Engineering, Louisiana State University, Rouge, LA, 70803-6409, Baton
关键词
D O I
10.1080/00207549208942936
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A just-in-time (JIT) buyer demands frequent deliveries of small lots of certain products. However, there is a perception among the suppliers that participation in a JIT delivery system is economically disadvantageous for them. To test this conjecture, a generalized inventory model is developed for a supplier who has to meet a deterministic demand at fixed intervals. The generalized total cost model developed here is found to be a piecewise convex function. A simple algorithm is developed to compute the optimal batch size. When production uptime and cycle time are each equal to an integer multiple of the shipment interval, a perfect matching of shipment size occurs, and for such a situation, the generalized model specializes to more traditional inventory models. The solution approach for such models becomes much easier. It is found that, under certain conditions, the total cost decreases linearly with reduced shipment size and the suppliers benefit from this. Economic impact of ordering and setup costs reduction are also investigated.
引用
收藏
页码:961 / 972
页数:12
相关论文
共 15 条
[1]  
Billington P.J., The classic economic production quantity model with setup cost as a function of capital expenditure, Decision Sciences, 18, 1, pp. 25-42, (1987)
[2]  
Chapman S.N., Just-in-time supplier inventory-an empirical implementation model, International Journal of Production Research, 27, 12, pp. 1993-2007, (1989)
[3]  
Chapman S.N., Carter P.L., Supplier/customer inventory relationships under just- in-time, Decision Science, 21, pp. 35-51, (1990)
[4]  
Chakraborty S., Rao R., EBQ for a multi-stage production system considering rework, Opsearch, 25, pp. 75-88, (1988)
[5]  
Das C., Supply and redistribution rules for two-location inventory system: One-period analysis, Management Science, 21, pp. 765-776, (1975)
[6]  
Gupta Y.P., A feasibility study of JIT purchasing implementation in a manufacturing facility, International Journal Operations and Production Management, 20, 1, pp. 31-41, (1990)
[7]  
Hutchins D., Having a Hard Time with Just-In-Time. Fortune, 9, pp. 64-66, (1986)
[8]  
Jordan H.H., Inventory management in the JIT age, Production and Inventory Management, 29, 3, pp. 57-60, (1988)
[9]  
Lee S.M., Ansari A., Comparative analysis of Japanese just-in-time purchasing and traditional US purchasing systems, International Journal of Operations and Production Management, 5, 4, pp. 5-14, (1985)
[10]  
Moinzadeh K., Aggarwal P., Order expedition in multi-level production/inventory systems, Tims/Orsa Joint National Meeting, pp. 7-9, (1990)