CHANNEL EROSION ALONG THE CARMEL RIVER, MONTEREY COUNTY, CALIFORNIA

被引:34
作者
KONDOLF, GM [1 ]
CURRY, RR [1 ]
机构
[1] UNIV CALIF SANTA CRUZ,BOARD ENVIRONM SCI,SANTA CRUZ,CA 95064
关键词
FLOW OF FLUIDS - Sediment Transport - FLOW OF WATER - Channel Flow;
D O I
10.1002/esp.3290110308
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
The Carmel River underwent massive bank erosion, channel migration, and aggradation in a major flood in 1911, then narrowed and incised by 1939. The channel was stable until 1978 and 1980, when bank erosion affected some reaches but not others. The narrowing and incision were in response to a lack of major floods after 1914 and construction in 1921 of a dam that cut off sediment supply. Localized erosion in 1978 and 1980 occurred during low magnitude events along reaches whose bank strength had been reduced by devegetation. These events illustrate that the stability of a fluvial system can be disrupted either by application of a large erosive force in a high magnitude event or in a low magnitude event, by reducing the resistance to erosion. The Carmel River is a potentially unstable system. Its discharge and slope characteristics place it near the threshold between meandering and braided.
引用
收藏
页码:307 / 319
页数:13
相关论文
共 34 条
  • [1] [Anonymous], 1967, S RIV MORPH
  • [2] BRICE JC, 1964, USGS422D PROF PAP
  • [3] CARLSON FR, 1978, CARMEL VALLEY VEGETA
  • [4] CHARLTON FG, 1978, IT180 HYDR RES STA R
  • [5] DANIEL JP, 1971, USGS732A PROF PAP
  • [6] GRAF WL, 1978, GEOL SOC AM BULL, V89, P1491, DOI 10.1130/0016-7606(1978)89<1491:FATTSO>2.0.CO
  • [7] 2
  • [8] CHANNEL INSTABILITY IN A BRAIDED, SAND BED RIVER
    GRAF, WL
    [J]. WATER RESOURCES RESEARCH, 1981, 17 (04) : 1087 - 1094
  • [9] GRIFFEN JR, 1981, P FIRE HIST WORKSHOP, P82
  • [10] Hadley R., 1961, US GEOLOGICAL SURV C, P30