EQUIPMENT SELECTION AND MACHINE SCHEDULING IN GENERAL MAIL FACILITIES

被引:17
作者
JARRAH, AIZ
BARD, JF
DESILVA, AH
机构
[1] UNIV TEXAS,DEPT MECH ENGN,GRAD PROGRAM OPERAT RES & IND ENGN,AUSTIN,TX 78712
[2] PLANMAT INC,BETHESDA,MD 20817
[3] GEORGETOWN UNIV,SCH BUSINESS ADM,WASHINGTON,DC 20057
关键词
FACILITY PLANNING; EQUIPMENT SELECTION; MIXED INTEGER LINEAR PROGRAMMING; MACHINE SCHEDULING; LARGE SCALE SYSTEMS; POSTAL OPERATIONS;
D O I
10.1287/mnsc.40.8.1049
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
With the goal of fiscal self-sufficiency, the United States Postal Service (USPS) has embarked upon a 10-year program to modernize, and in some cases radically alter, the way it manages and processes the mail. At the heart of this effort is the goal of automating virtually all of the letter mail by 1995. This means reading, sorting, and then sequencing each mail piece to the order in which it will be delivered by the carrier with only a minimum of manual labor. In support of this goal, a series of long-term planning models has been developed to help select equipment and plan for its use at the more than 250 general mail facilities (GMF) throughout the nation. This paper reports on one of the central studies underlying this effort. Because of the size and complexity of the facility design problem, a hierarchical approach was followed. Three interrelated models were developed starting with a mixed integer linear program to derive equipment needs and initial machine schedules. The latter are post-processed in two stages to produce implementable schedules that reflect current practice. An auxiliary linear program and a heuristic were constructed for this purpose. The models and analysis conducted are demonstrated with data obtained from the Providence GMF. The results indicate that near optimal solutions can be found quite efficiently and are expected to lead to substantial savings over the 10-year planning horizon.
引用
收藏
页码:1049 / 1068
页数:20
相关论文
共 24 条
[1]   AN ALGORITHM FOR THE MANUFACTURING EQUIPMENT SELECTION PROBLEM [J].
BARD, JF ;
FEO, TA .
IIE TRANSACTIONS, 1991, 23 (01) :83-92
[2]  
BARD JF, 1990, 4TH P USPS ADV TECHN, V3, P1381
[3]  
Bitran G., 1977, DECISION SCI, V8, P28, DOI 10.1111/j.1540-5915.1977.tb01066.x
[4]  
Brooke A., 1988, GAMS USERS GUIDE
[5]   MANAGEMENT SCIENCE IN AUTOMATING POSTAL OPERATIONS - FACILITY AND EQUIPMENT PLANNING IN THE UNITED-STATES-POSTAL-SERVICE [J].
CEBRY, ME ;
DESILVA, AH ;
DILISIO, FJ .
INTERFACES, 1992, 22 (01) :110-130
[6]   AN INTERACTIVE FRAMEWORK FOR FORMULATING AND EVALUATING A SYSTEM INCORPORATING NEW TECHNOLOGIES [J].
DESILVA, AH ;
DELEO, G ;
GENNARI, N .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 47 (02) :162-171
[7]  
*ELS INC, 1987, CARD OFF PROJ CONC D
[8]  
GOODELL C, 1990, APM TRAINING MANUAL
[9]  
*IBM INC, 1990, OPT SUBR LIBR GUID R
[10]  
JARRAH A, 1992, SOLVING LARGE SCALE