共 16 条
[1]
Ashley D.B., Contract risk allocation and cost effectiveness, CII Publ, (1988)
[2]
Doyle P., The litigation/liability crisis, CONSTRUCTOR, pp. 18-20, (1989)
[3]
Groton J., Preventing and Resolving Construction Disputes, (1991)
[4]
Henderson T., Analysis of construction disputes and strategies for cost minimization, Cost Engrg, 33, 11, pp. 17-21, (1991)
[5]
Howell G., How owners and contractors organize project teams, CII Publ. SD-53, (1990)
[6]
Kamenetzky R., The relationship between the analytical hierarchy process and the additive value function, Decision Sci., 13, pp. 702-713, (1982)
[7]
Miller J., Professional decision making, (1970)
[8]
Nelson M., Illingworth W., A practical guide to neural networks, (1991)
[9]
NeuroShell 2 user's manual, (1993)
[10]
Norusis M., SPSS user's manual, (1990)