共 20 条
[1]
Bondi A.B., Whitt W., The influence of service-time variability in a closed network of queues, Performance Evaluation, 6, pp. 219-234, (1986)
[2]
Goldratt E.M., Computerized shop floor scheduling, International Journal of Production Research, 26, pp. 443-455, (1988)
[3]
Goldratt E.M., Fox R.E., The Race, (1986)
[4]
Graves S.C., Safety stocks in manufacturing systems, Journal of Manufacturing and Operations Management, 1, pp. 67-101, (1988)
[5]
Haul W.R., Driving the Productivity Machine: Production Planning and Control in Japan, (1981)
[6]
Hall W.R., Zero Inventories, (1983)
[7]
Hopp W.J., Spearman M., Woodruff D., Practical Strategies for Lead Time Reduction, (1988)
[8]
Kanbt J.J., Inventory planning at Black and Decker, Production and Inventory Managment, 25, 3, (1984)
[9]
Kanet J., MRP 96: Time to rethink manufacturing logistics, Production and Inventory Management Journal, 29, pp. 57-61, (1988)
[10]
Karmarker U.S., Lot sizes, lead times and in-process inventories, Management Science, 33, pp. 409-423, (1987)