ON THE OPTIMALITY OF STATIC PRIORITY POLICIES IN STOCHASTIC SCHEDULING ON PARALLEL MACHINES

被引:22
作者
KAMPKE, T
机构
关键词
D O I
10.2307/3214267
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
引用
收藏
页码:430 / 448
页数:19
相关论文
共 10 条
[1]   SEQUENCING TASKS WITH EXPONENTIAL SERVICE TIMES TO MINIMIZE THE EXPECTED FLOW TIME OR MAKESPAN [J].
BRUNO, J ;
DOWNEY, P ;
FREDERICKSON, GN .
JOURNAL OF THE ACM, 1981, 28 (01) :100-113
[2]   SCHEDULING TASKS WITH EXPONENTIAL SERVICE TIMES ON PARALLEL PROCESSORS [J].
GLAZEBROOK, KD .
JOURNAL OF APPLIED PROBABILITY, 1979, 16 (03) :685-689
[3]  
Lovasz L., 1983, MATH PROGRAMMING STA, P235, DOI DOI 10.1007/978-3-642-68874-4_10
[4]  
Mohring R. H., 1985, Zeitschrift fur Operations Research, Serie A (Theorie), V29, P65, DOI 10.1007/BF01918198
[5]  
MOHRING RH, 1985, CONTRIBUTIONS OPERAT, P72
[6]  
PRASAD VR, 1982, J APPL PROB, V19, P741
[7]  
TRIVEDI KS, 1982, PROBABILITY STATISTI
[8]   SCHEDULING JOBS WITH STOCHASTICALLY ORDERED PROCESSING TIMES ON PARALLEL MACHINES TO MINIMIZE EXPECTED FLOWTIME [J].
WEBER, RR ;
VARAIYA, P ;
WALRAND, J .
JOURNAL OF APPLIED PROBABILITY, 1986, 23 (03) :841-847
[9]   SCHEDULING JOBS WITH STOCHASTIC PROCESSING REQUIREMENTS ON PARALLEL MACHINES TO MINIMIZE MAKESPAN OR FLOWTIME [J].
WEBER, RR .
JOURNAL OF APPLIED PROBABILITY, 1982, 19 (01) :167-182
[10]   SCHEDULING TASKS WITH EXPONENTIAL SERVICE TIMES ON NON-IDENTICAL PROCESSORS TO MINIMIZE VARIOUS COST-FUNCTIONS [J].
WEISS, G ;
PINEDO, M .
JOURNAL OF APPLIED PROBABILITY, 1980, 17 (01) :187-202