CONTROL OF MATERIAL HANDLING TRANSPORTER IN AUTOMATED MANUFACTURING

被引:34
作者
HAN, MH [1 ]
MCGINNIS, LF [1 ]
机构
[1] GEORGIA INST TECHNOL,SCH IND & SYST ENGN,ATLANTA,GA 30332
关键词
D O I
10.1080/07408178908966222
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:184 / 190
页数:7
相关论文
共 12 条
[1]   EXPERIMENTAL COMPARISON OF SOLUTION ALGORITHMS FOR SINGLE-MACHINE TARDINESS PROBLEM [J].
BAKER, KR ;
MARTIN, JB .
NAVAL RESEARCH LOGISTICS, 1974, 21 (01) :187-199
[2]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[3]   CLASSIFICATION IN VEHICLE-ROUTING AND SCHEDULING [J].
BODIN, L ;
GOLDEN, B .
NETWORKS, 1981, 11 (02) :97-108
[4]  
CASSANDRAS C, 1984, 1ST P ORSA TIMS SPEC, P397
[5]   CHARACTERIZATION OF AUTOMATIC GUIDED VEHICLE DISPATCHING RULES [J].
EGBELU, PJ ;
TANCHOCO, JMA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :359-374
[6]  
French S., 1982, SEQUENCING SCHEDULIN
[7]  
MAIMON OZ, 1986, 2ND P ORSA TIMS C FL, P467
[8]  
SEIDMANN A, 1986, 2ND P ORSA TIMS C FL, P467
[9]  
VEPSALAINEN APG, 1987, MANAGE SCI, V8, P1035
[10]   MODELING THE PERFORMANCE OF FLEXIBLE MANUFACTURING SYSTEMS [J].
YAO, DD ;
BUZACOTT, JA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1985, 23 (05) :945-959