A COMPARISON OF JUST-IN-TIME AND BATCH MANUFACTURING - THE ROLE OF PERFORMANCE OBSTACLES

被引:18
作者
BROWN, KA
MITCHELL, TR
机构
[1] UNIV WASHINGTON,BUSINESS ADM,SEATTLE,WA 98195
[2] UNIV WASHINGTON,PSYCHOL,SEATTLE,WA 98195
关键词
D O I
10.2307/256395
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:906 / 917
页数:12
相关论文
共 18 条
[1]  
BAILEY J, 1988, WALL STREET J 1017, P4
[2]  
BAILEY J, 1988, WALL STREET J 1017, pA1
[3]   PERFORMANCE OBSTACLES FOR DIRECT AND INDIRECT LABOR IN HIGH TECHNOLOGY MANUFACTURING [J].
BROWN, KA ;
MITCHELL, TR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (11) :1819-1832
[4]  
DRUCKER PF, 1981, HARVARD BUS REV, V61, P83
[5]  
Fry T.D., 1987, PRODUCTION INVENTORY, V7, P4
[6]  
HALL EH, 1989, ACADEMY MANAGEMENT E, V3, P315
[7]  
HANNAH KH, 1987, PRODUCTION INVENTORY, V7, P1
[8]  
Heiko L., 1989, ACADEMY MANAGEMENT E, V3, P319
[9]  
HENDRICK TE, 1988, PRODUCTION INVENTORY, V8, P30
[10]  
HUBER VL, 1985, J OPERATIONS MANAGEM, V5, P213