共 26 条
[1]
Ammons J.C., Lofgren C.B., McGinnis L.F., A large scale machine loading problem in flexible assembly, Annals of Operations Research, 3, pp. 319-322, (1985)
[2]
Berrada M., Stecke K.E., A branch and bound approach for machine load balancing in flexible manufacturing systems, Management Science, 32, pp. 1316-1335, (1986)
[3]
Buzacoit J.A., Shanthikumar J.G., Models for understanding flexible manufacturing systems, AIIE Transactions, 12, pp. 339-349, (1980)
[4]
Conway R.W., Priority dispatching and job lateness in a job shop, The Journal of Industrial Engineering, (1965)
[5]
Dhar U.R., Overview of models and DSS in planning and scheduling of FMS, International Journal of Production Economics, 25, pp. 121-127, (1991)
[6]
Ding F.-Y., Duangjai K.K., Constructive heuristics for flexible flow lines, Computers and Industrial Engineering (Under Revision), (1991)
[7]
Gupta J., Heuristic algorithms for multistage flowshop scheduling problem, AIIE Transactions, 4, pp. 11-18, (1972)
[8]
Hutchinson J., Scheduling Random Job Shop Flexible Manufacturing Systems, (1988)
[9]
Hutchinson J., Leong K., Snyder D., Ward P., Scheduling for random job shop flexible manufacturing systems, Proceedings of the Third ORSA/TIMS Conference on FMS: Operations Research Models and Applications, pp. 161-166, (1989)
[10]
Iwata K., Murotsu Y., Oba F., Solution of large-scale scheduling problems for jobshop type machine systems with alternative machine tools, Annuals Ofthe CIRP, 29, pp. 335-338, (1980)