HEURISTIC TECHNIQUES FOR SIMULTANEOUS SCHEDULING OF PRODUCTION AND DISTRIBUTION IN MULTI-ECHELON STRUCTURES - THEORY AND EMPIRICAL COMPARISONS

被引:83
作者
WILLIAMS, JF
机构
关键词
D O I
10.1287/mnsc.27.3.336
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:336 / 352
页数:17
相关论文
共 43 条
[1]  
Biggs J. R., 1979, Decision Sciences, V10, P96, DOI 10.1111/j.1540-5915.1979.tb00010.x
[2]  
BLACKBURN JD, IMPROVED HEURISTICS
[3]   OPTIMAL POLICIES FOR A MULTI-ECHELON INVENTORY PROBLEM [J].
CLARK, AJ ;
SCARF, H .
MANAGEMENT SCIENCE, 1960, 6 (04) :475-490
[4]   INFORMAL SURVEY OF MULTI-ECHELON INVENTORY THEORY [J].
CLARK, AJ .
NAVAL RESEARCH LOGISTICS, 1972, 19 (04) :621-650
[5]   DYNAMIC LOT SIZE MODELS FOR MULTI-STAGE ASSEMBLY SYSTEMS [J].
CROWSTON, WB ;
WAGNER, MH .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :14-21
[6]   ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS [J].
CROWSTON, WB ;
WAGNER, M ;
WILLIAMS, JF .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 19 (05) :517-527
[7]  
CROWSTON WB, 1972, DEC AIIE T, P313
[8]   SOLUTION OF A MULTI-PRODUCT MANUFACTURING AND DISTRIBUTION PROBLEM [J].
FOLIE, M ;
TIFFIN, J .
MANAGEMENT SCIENCE, 1976, 23 (03) :286-296
[9]   MULTISTAGE PRODUCTION PLANNING [J].
GABBAY, H .
MANAGEMENT SCIENCE, 1979, 25 (11) :1138-1148
[10]  
GORENSTEIN S, 1970, MANAGE SCI B-APPL, V17, pB72