共 23 条
[1]
Allison J.W., Vapor J.C., GT approach proves out, American Machinist, 123, pp. 197-200, (1979)
[2]
Blackstone J.H., Phillips D.T., Hogg G.L., A-state-of-the-art survey of dispatching rules for manufacturing job shop operations, International Journal of Production Research, 20, pp. 27-45, (1982)
[3]
Burbidge J.L., The Introduction of Group Technology, (1975)
[4]
Conway R.W., Maxwell W.L., Miller L.W., Theory of Scheduling, (1967)
[5]
Elvers D.A., The sensitivity of the relative effectiveness of job-shop dispatching rules with respect to various arrival distributions, AIIE Transactions, 6, pp. 41-49, (1974)
[6]
Flynn B.B., Repetitive lots: The use of a sequence dependent set up time scheduling procedure in group technology and traditional job shop, Journal of Operations Management, 7, pp. 203-216, (1987)
[7]
Jacobs F.R., Bragg D.J., Repetitive lots: Flow time reduction through sequencing and dynamic batch sizing, Decision Sciences, 19, pp. 281-294, (1988)
[8]
Law A.M., Kelton W.D., Simulation Modeling & Analysis, (1991)
[9]
Mahmoodi F., Dooley K.J., A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell, International Journal of Production Research, 29, pp. 1923-1939, (1991)
[10]
Mahmoodi F., Dooley K.J., Shop floor control in cellular manufacturing: State-of the-art review and foundations for research, Production Planning and Control, 3, pp. 70-80, (1992)