PRODUCTION-SCHEDULING PROBLEM WITH BATCH PROCESSING

被引:12
作者
DORSEY, RC
HODGSON, TJ
RATLIFF, HD
机构
[1] TENNESSEE EASTMAN CO,KINGSPORT,TN 37600
[2] UNIV FLORIDA,GAINESVILLE,FL
关键词
D O I
10.1287/opre.22.6.1271
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:1271 / 1279
页数:9
相关论文
共 18 条
  • [1] BARR RS, 1972, CS102 U TEX CTR CYB
  • [2] BOMBERGER E, 1966, MANAGE SCI, V12, P778
  • [3] PRODUCTION SCHEDULING BY THE TRANSPORTATION METHOD OF LINEAR-PROGRAMMING
    BOWMAN, EH
    [J]. OPERATIONS RESEARCH, 1956, 4 (01) : 100 - 103
  • [4] DORSEY RC, 1973, 735 U FLOR RES REP
  • [5] ELMAGHRABY S, 1972, OR76 N CAR STAT U RE
  • [6] ELMAGHRABY S, 1970, AIIE T, V2, P203
  • [7] ELMAGHRABY SE, 1968, NAV RES LOGIST Q, V15, P205
  • [8] Ford Lester R., 1962, FLOWS NETWORKS
  • [9] FULKERSON DR, 1961, J SOC IND APPL MATH, V9, P19
  • [10] HAESSLER RW, 1971, MANAGE SCI B-APPL, V18, pB240