DETERMINISTIC PRODUCTION PLANNING - ALGORITHMS AND COMPLEXITY

被引:388
作者
FLORIAN, M
LENSTRA, JK
RINNOOYKAN, AHG
机构
[1] MATH CENTRUM,NL-1005 AMSTERDAM,NETHERLANDS
[2] ERASMUS UNIV,ROTTERDAM,NETHERLANDS
关键词
D O I
10.1287/mnsc.26.7.669
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:669 / 679
页数:11
相关论文
共 24 条
[1]  
[Anonymous], 1971, STOC 71, DOI DOI 10.1145/800157.805047
[2]  
Baker KennethR., 1978, MANAGE SCI, V24, P1710, DOI DOI 10.1287/MNSC.24.16.1710
[3]  
Bellman R. E., 1962, APPL DYNAMIC PROGRAM
[4]  
Busacker R, 1961, 15 J HOPK U OP RES O
[5]  
CHEN K, UNPUBLISHED
[6]   SHORTEST-ROUTE METHODS .1. REACHING, PRUNING, AND BUCKETS [J].
DENARDO, EV ;
FOX, BL .
OPERATIONS RESEARCH, 1979, 27 (01) :161-186
[7]   PATHS TREES AND FLOWERS [J].
EDMONDS, J .
CANADIAN JOURNAL OF MATHEMATICS, 1965, 17 (03) :449-&
[8]   DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS [J].
FLORIAN, M ;
KLEIN, M .
MANAGEMENT SCIENCE SERIES A-THEORY, 1971, 18 (01) :12-20
[9]  
Garey M.R., 1979, COMPUTERS INTRACTABI
[10]   STRONG NP-COMPLETENESS RESULTS - MOTIVATION, EXAMPLES, AND IMPLICATIONS [J].
GAREY, MR ;
JOHNSON, DS .
JOURNAL OF THE ACM, 1978, 25 (03) :499-508