COMPARATIVE PERFORMANCE ANALYSIS OF PRIORITY RULES IN A CONSTRAINED FLOW-SHOP WITH MULTIPLE PROCESSORS ENVIRONMENT

被引:57
作者
HUNSUCKER, JL
SHAH, JR
机构
[1] Department of Industrial Engineering, University of Houston, Houston
基金
美国国家航空航天局;
关键词
FLOW SHOP; MULTIPLE PROCESSORS; SIMULATION;
D O I
10.1016/0377-2217(94)90333-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Scheduling in a flow shop with multiple processors (FSMP) involves the sequencing of n jobs in a flow shop, where two or more identical processors are allowable at a machine stage. The constrained flow shop with multiple processors problem (CFSMP) considered in this study is a special case of the FSMP problem, in which the total number of jobs that can concurrently exist in the system is bounded by a prespecified number. A simulation experiment was performed to investigate the performance of six priority rules in the CFSMP environment for three performance measures namely makespan, mean flow time, and maximum flow time. A dynamic simulation model of the constrained flow shop with multiple processors environment was developed in which the queuing priorities at each machine stage were established dynamically. The results of the simulation study indicated that the shortest processing time first dispatching procedure (SPT) yielded superior performance for the makespan and mean flow time criteria. However, for the maximum flow time criterion, clear superiority of a particular dispatching procedure was not established.
引用
收藏
页码:102 / 114
页数:13
相关论文
共 49 条
[1]   PRIORITY UPDATE INTERVALS AND ANOMALIES IN DYNAMIC RATIO TYPE JOB SHOP SCHEDULING RULES [J].
ADAM, NR ;
SURKIS, J .
MANAGEMENT SCIENCE, 1980, 26 (12) :1227-1237
[2]  
Arthanary T.S., 1971, OPER RES, V8, P10
[3]   SIMULATION OF A SIMPLIFIED JOB SHOP [J].
BAKER, CT ;
DZIELINSKI, BP .
MANAGEMENT SCIENCE, 1960, 6 (03) :311-323
[4]  
Baker K., 1974, INTRO SEQUENCING SCH
[5]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[6]  
BOX GEP, 1978, STATISTICS EXPT
[7]   BRANCH AND BOUND ALGORITHM FOR THE FLOW-SHOP WITH MULTIPLE PROCESSORS [J].
BRAH, SA ;
HUNSUCKER, JL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :88-99
[8]  
BRAH SA, 1988, THESIS U HOUSTON HOU
[9]  
Buten R. E., 1973, Proceedings of the 1973 Sagamore Computer Conference on Parallel Processing, P130
[10]   ON APPROXIMATE QUEUING MODELS OF DYNAMIC JOB SHOPS [J].
BUZACOTT, JA ;
SHANTHIKUMAR, JG .
MANAGEMENT SCIENCE, 1985, 31 (07) :870-887