SCHEDULING TO MINIMIZE MAXIMUM LATENESS ON UNEQUAL PARALLEL PROCESSORS

被引:2
作者
DE, P [1 ]
MORTON, TE [1 ]
机构
[1] CARNEGIE MELLON UNIV,GRAD SCH IND ADM,PITTSBURGH,PA 15213
关键词
D O I
10.1016/0305-0548(82)90020-X
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:221 / 232
页数:12
相关论文
共 10 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
Brucker P., 1977, Mathematics of Operations Research, V2, P275, DOI 10.1287/moor.2.3.275
[3]   SCHEDULING INDEPENDENT TASKS TO REDUCE MEAN FINISHING TIME [J].
BRUNO, J ;
COFFMAN, EG ;
SETHI, R .
COMMUNICATIONS OF THE ACM, 1974, 17 (07) :382-387
[4]   LOCATION OF BANK ACCOUNTS TO OPTIMIZE FLOAT - ANALYTIC STUDY OF EXACT AND APPROXIMATE ALGORITHMS [J].
CORNUEJOLS, G ;
FISHER, ML ;
NEMHAUSER, GL .
MANAGEMENT SCIENCE, 1977, 23 (08) :789-810
[5]  
De P., 1980, Decision Sciences, V11, P586, DOI 10.1111/j.1540-5915.1980.tb01163.x
[6]  
DEGROOT MH, 1975, PROBABILITY STATISTI
[7]  
Karp R. M., 1972, COMPLEXITY COMPUTER
[8]  
Knuth D. E., 1969, ART COMPUTER PROGRAM, V2
[9]  
SAHNI S, 1977, PREEMPTIVE SCHEDULIN
[10]  
SAHNI S, 1977, SCHEDULING INDEPENDE