FULL-SCALE EXPERIENCES WITH PHOSPHATE CRYSTALLIZATION IN A CRYSTALACTOR

被引:26
作者
EGGERS, E
DIRKZWAGER, AH
VANDERHONING, H
机构
[1] NETHERLANDS INST INLAND WATER MANAGEMENT & WASTE WATER TREATMENT,8200 AA LELYSTAD,NETHERLANDS
[2] WATER AUTHOR DRENTHE,9400 AE ASSEN,NETHERLANDS
关键词
PHOSPHATE REMOVAL; FLUIDIZED BED; PELLET REACTOR; CALCIUM PHOSPHATE CRYSTALLIZATION; TERTIARY WASTE-WATER TREATMENT;
D O I
10.2166/wst.1991.0533
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The first full-scale phosphate removal plant is nearly one year in operation. Values of 0.5 mg/l P or less are possible. No extra surplus is produced, but a relatively small amount of waterfree pellets, which can be reused in the phosphate processing industry.
引用
收藏
页码:819 / 824
页数:6
相关论文
共 3 条
  • [1] EGGERS E, 1986, REMOVAL PHOSPHATES W
  • [2] EGGERS E, 1986, 2ND INT GOTH S
  • [3] VANDIJK JC, 1984, WATER SCI TECHNOL, V17, P133