ESTIMATING GROUNDWATER RECHARGE USING A SURFACE WATERSHED MODEL - SENSITIVITY ANALYSES

被引:6
作者
CHIEW, FHS
MCMAHON, TA
机构
[1] Department of Civil and Agricultural Engineering, University of Melbourne, Vic.
关键词
D O I
10.1016/0022-1694(90)90063-4
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The methodology used to estimate groundwater recharge using a surface watershed modelling approach was presented in a complementary paper. This paper describes the analyses carried out to investigate the sensitivity of the objective function and the recharge estimates to the parameters in HYDROLOG. The analyses were carried out in Axe Creek Catchment (sub-area 1 in the complementary paper) using NLFIT (an optimisation package) and sensitivity plots. The analyses were performed to investigate the ability of HYDROLOG to estimate recharge and to guide further improvements in the model. Based on the analyses, a detailed discussion of the parameters in HYDROLOG is presented and the important parameters highlighted. © 1990.
引用
收藏
页码:305 / 325
页数:21
相关论文
共 9 条
[1]  
Bard Y., 1974, NONLINEAR PARAMETER
[2]   ESTIMATING GROUNDWATER RECHARGE USING A SURFACE WATERSHED MODELING APPROACH [J].
CHIEW, FHS ;
MCMAHON, TA .
JOURNAL OF HYDROLOGY, 1990, 114 (3-4) :285-304
[3]  
HEATWOLE CD, 1988, T ASAE, V31, P154
[4]   IMPROVED PARAMETER INFERENCE IN CATCHMENT MODELS .1. EVALUATING PARAMETER UNCERTAINTY [J].
KUCZERA, G .
WATER RESOURCES RESEARCH, 1983, 19 (05) :1151-1162
[5]  
KUCZERA G, 1987, FITTING TESTING MATH
[6]   AN ALGORITHM FOR LEAST-SQUARES ESTIMATION OF NONLINEAR PARAMETERS [J].
MARQUARDT, DW .
JOURNAL OF THE SOCIETY FOR INDUSTRIAL AND APPLIED MATHEMATICS, 1963, 11 (02) :431-441
[7]  
Porter J. W., 1971, J HYDROL, V13, P297, DOI [DOI 10.1016/0022-1694(71)90250-2, 10.1016/0022-1694(71)90250-2]
[8]  
PORTER JW, 1976, HYDROLOG276 MON U DE
[9]  
STORM DE, 1988, AM SOC AGR ENG, V13, P117