共 37 条
[31]
Woodruff, Subcontracting when there are setups, deadlines, and tooling costs, Working Paper, (1992)
[32]
Pochet, Wolsey, Solving multi-item lot-sizing problems using strong cutting planes, Mgmt. Sci., 37, pp. 53-67, (1991)
[33]
Dinkelbach, Zum Problem der Produktionsplanung in Ein- und Mehrproduktunternehmen, Physica, (1964)
[34]
Haehling von Lanzenauer, A production scheduling model by bivalent linear programming, Management Science, 17, pp. 105-111, (1970)
[35]
Lasdon, Terjung, An efficient algorithm for multi-item scheduling, Operations Research, 19, pp. 946-969, (1971)
[36]
Gascon, Leachman, A dynamic programming solution to the dynamic multi-item, single-machine scheduling problem, Oper. Res., 36, pp. 50-56, (1988)
[37]
Karmarkar, Kekre, Kekre, The dynamic lot-sizing problem with startup and reservation costs, Oper. Res., 35, pp. 389-398, (1987)