共 42 条
[1]
Akella R., Choong Y., Gershwin S.B., Performance of hierarchical production scheduling policy, IEEE Transactions on Components, Hybrids and Manufacturing Technology, pp. 225-240, (1984)
[2]
Adams J., Balas E., Zawack D., The shifting bottleneck procedure for job shop scheduling, Management Science, 34, pp. 391-401, (1988)
[3]
Barnes J.W., Laguna M., A Tabu Search experience in production scheduling, Annals of Operations Research, 41, pp. 141-156, (1993)
[4]
Bertrand J., Wortmann J.C., Wungaard J., Production Control: A Structural and Design Oriented Approach, (1990)
[5]
Blazewicz J., Cellary W., Slowinski R., Weglarz J., Scheduling under resource constraints-e-deterministic models, Annals of Operations Research, 7, (1986)
[6]
Brah S.A., Hunsucker J., Branch and bound algorithm for the flow shop with multiple processors, European Journal of Operational Research, 51, pp. 88-99, (1991)
[7]
Brandimarte P., Routeing and scheduling in a flexible job shop by Tabu Search, Annals of Operations Research, 41, pp. 157-183, (1993)
[8]
Browne J., Harhen J., Shivnan J., Production Management Systems-A CIM Perspective, (1988)
[9]
Caramanis M., Sharifnia A., Near optimal manufacturing flow controller design, International Journal of Flexible Manufacturing Systems, 3, pp. 321-336, (1991)
[10]
Chang S.-C., Liao D.-Y., Hsieh F.-S., Scheduling flexible flow shops of no setup cost by a lagrangian relaxation and network reformulation approach, Proceedings of the 1991 IEEE International Conference on Robotics and Automation, pp. 1054-1059, (1991)