共 42 条
[21]
Garey M.R., Johnson D.S., Computers and Intractability: A Guide to the Theory of Np-Completeness, (1979)
[22]
Gershwin S.B., Manufacturing Systems Engineering, (1994)
[23]
Gershwin S.B., Hildebrandt R.R., Mitter S.K., Suri R., A control theorist’s perspective on recent trends in manufacturing systems, IEEE Control Systems Magazine, 6, pp. 3-15, (1986)
[24]
Ignizio J.P., Goal Programming and Extensions, (1976)
[25]
Jacobs F.R., The OPT scheduling system: A review of a new production scheduling system, Production and Inventories Management, pp. 47-51, (1983)
[26]
Kim Y.-D., A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings, International Journal of Production Research, 28, pp. 953-962, (1990)
[27]
Kim S.-Y., Leachman R.C., Multi-project with explicit lateness costs, IIE Transactions, 25, pp. 34-44, (1993)
[28]
Kimemia J.G., Gershwin S.B., An algorithm for the computer control of production in flexible manufacturing systems, IIE Transactions, 15, pp. 353-362, (1983)
[29]
Lawler E.L., Lenstra J.K., Rinnooy Kan A., Shmoys D.B., Sequencing and scheduling: Algorithms and complexity, Logistics of Production and Inventory, pp. 445-522, (1993)
[30]
Leachman R.C., Modeling techniques for automated production planning in the semiconductor industry, Optimization in Industry, (1993)