OPTIMAL TOTAL-WORK-CONTENT-POWER DUE-DATE DETERMINATION AND SEQUENCING

被引:7
作者
CHENG, TCE
机构
关键词
D O I
10.1016/0898-1221(87)90184-2
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
引用
收藏
页码:579 / 582
页数:4
相关论文
共 11 条
[1]   OPTIMAL DUE-DATE ASSIGNMENT IN A JOB SHOP [J].
CHENG, TCE .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (03) :503-515
[2]  
CHENG TCE, 1984, J OPER RES SOC, V35, P433
[3]  
CHENG TCE, 1982, ADV PRODUCTION MANAG, P363
[4]  
CHENG TCE, IN PRESS INT J SYSTE
[5]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P228
[6]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[8]   COMMON DUE DATE ASSIGNMENT TO MINIMIZE TOTAL PENALTY FOR THE ONE MACHINE SCHEDULING PROBLEM [J].
PANWALKAR, SS ;
SMITH, ML ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1982, 30 (02) :391-399
[9]   DUE DATE ASSIGNMENT FOR PRODUCTION SYSTEMS [J].
SEIDMANN, A ;
SMITH, ML .
MANAGEMENT SCIENCE, 1981, 27 (05) :571-581
[10]   OPTIMAL ASSIGNMENT OF DUE-DATES FOR A SINGLE PROCESSOR SCHEDULING PROBLEM [J].
SEIDMANN, A ;
PANWALKAR, SS ;
SMITH, ML .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (04) :393-399