OPTIMAL TIMING OF REVIEWS IN CONCURRENT DESIGN FOR MANUFACTURABILITY

被引:118
作者
HA, AY [1 ]
PORTEUS, EL [1 ]
机构
[1] STANFORD UNIV,SCH BUSINESS,STANFORD,CA 94305
关键词
CONCURRENT DESIGN; CONCURRENT ENGINEERING; SIMULTANEOUS ENGINEERING; PRODUCT DESIGN; PROCESS DESIGN; PARALLEL DEVELOPMENT; QUALITY CONTROL; PROGRESS REVIEWS; OPTIMIZATION; QUADRATIC PROGRAM;
D O I
10.1287/mnsc.41.9.1431
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Concurrent design can reduce the time required to develop new products and redesign old ones. In contrast to the conventional approach, in which the product design is (nearly) completed before it is ''thrown over the wall'' to the process design group, concurrent design for manufacturability, as conceptualized here, conducts a number of progress reviews during the product design process. Frequent reviews have two benefits: (1) (Parallel Development) process designers receive sufficient information about the design to enable them to work in parallel with the product designers, and (2) (Quality Control) flaws in the design are discovered soon after they are introduced, saving the time and resources required for redesign later. The disadvantage of frequent reviews is that each review requires setup/penalty time that otherwise would not be required. The optimal policy is derived for some special stationary cases of the model. When the parallel development benefit dominates, the review periods either increase or decrease according to the rate at which product design work empowers useful process design work to be conducted. When the quality control benefit dominates, the review periods will vary only to the extent that the quality related parameters change. Numerical examples illustrate the insights gained from the analysis.
引用
收藏
页码:1431 / 1447
页数:17
相关论文
共 25 条
[1]  
BLACK A, 1990, MIT320890MS SLOAN SC
[2]  
Blackburn JD, 1991, TIME BASED COMPETITI
[3]  
BUSSEY J, 1988, WALL STREET J 0223, P1
[4]  
Clark K.B., 1987, BROOKINGS PAPERS EC, V3, P729, DOI DOI 10.2307/2534453
[5]   A METHODOLOGY AND COMPUTATIONAL FRAMEWORK FOR CONCURRENT PRODUCT AND PROCESS DESIGN [J].
CUTKOSKY, MR ;
TENENBAUM, JM .
MECHANISM AND MACHINE THEORY, 1990, 25 (03) :365-381
[6]   THE NEGLECT OF ENGINEERING DESIGN [J].
DIXON, JR ;
DUFFEY, MR .
CALIFORNIA MANAGEMENT REVIEW, 1990, 32 (02) :9-23
[7]  
EPPINGER S, 1991, MODEL BASED APPROACH
[8]   THE TIME-COST TRADEOFF IN RESEARCH AND DEVELOPMENT - A REVIEW [J].
GRAVES, SB .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 16 (01) :1-9
[9]  
HENDERSON B, 1992, AVIATION WEEK SPACE, V136, P49