TOOLING CONSTRAINTS AND SHOP FLOOR SCHEDULING - EVALUATING THE IMPACT OF SEQUENCE DEPENDENCY

被引:15
作者
GHOSH, S
MELNYK, SA
RAGATZ, GL
机构
[1] Department of Management, The Eli Broad Graduate School of Management, Michigan State University, East Lansing, MI
关键词
D O I
10.1080/00207549208942954
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In a previous study, we began the process of examining how finite tooling resources affect the operation of a simulated job shop. The paper extends this line of research by focusing on the problem of how to schedule a shop operating with both finite machine and tooling resources, and faced by varying levels of tooling-related sequence dependency in the setups. Four tool assignment rules and two dispatching procedures are evaluated. Findings show the importance of using tool assignment rules which consider not only tool-related information such as tool availability but also the priority of the jobs waiting to be processed. Specifically, as the level of sequence dependence increases and the availability of tooling decreases, the performance of the shop is greatly influenced by the tool assignment rule used to manage the flow of tooling to and from work centres.
引用
收藏
页码:1237 / 1253
页数:17
相关论文
共 33 条
[21]  
Miller J.G., Berry W.L., Heuristic methods for assigning men to machines: An experimental analysis, AIIE, 6, 2, pp. 97-104, (1974)
[22]  
Nelson R.T., Labor assignment as a dynamic control probiem, Management Science, 10, 12, pp. 369-375, (1965)
[23]  
Nelson R.T., Labor and machinc limited production systems, Management Science, 12, 6, pp. 648-671, (1967)
[24]  
Nelson R.T., A simulation of labor efficiency and centralized assignment in a production system, Management Science, 17, 2, (1970)
[25]  
Neter J., Wasserman W., Kutnbr M.H., Applied Linear Statistical Models, (1985)
[26]  
Savoie R.M., How to simplify tool requirements planning in a high volume repetitive shop, American Production and Inventory Control Society 30Th Annual International Conference Proceedings, pp. 100-103, (1987)
[27]  
Smolik D., Material Requirements of Manufacturing, (1983)
[28]  
Tang C.S., Denardo E.V., Models arising from a flexible manufacturing machine, Part 1: Minimization of the number of tool switches and Part II: Minimization of the number of switching instants, Operations Research, 36, 5, pp. 767-784, (1988)
[29]  
Treleven M.D., Elvers D.A., An investigation of labor assignment rules in a dualconstrained job shop, Journal of Operations Management, 6, 1, pp. 51-68, (1985)
[30]  
Wassweiler W.R., Tooling requirements planning, American Production and Inventory Control Society 25Th Annual Conference Proceedings, pp. 160-162, (1982)