CONFLICTING OBJECTIVES AND RISK IN POWER-SYSTEM PLANNING

被引:44
作者
CROUSILLAT, EO
DORFNER, P
ALVARADO, P
MERRILL, HM
机构
[1] HUNGARIAN ELECTR BOARD,BUDAPEST,HUNGARY
[2] COSTA RICAN ELECTR UTIL,SAN JOSE,COSTA RICA
[3] POWER TECHNOL INC,SCHENECTADY,NY 12301
关键词
Costa Rican electric utility - Hungarian electricity board - Swedish state power board;
D O I
10.1109/59.260914
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Planning in the 1990s must deal with a wide range of options, with conflicting objectives, and with uncertainty. Types of conflict among planning objectives are illustrated and categorized. Risk is distinguished from uncertainty and both are quantified. Hedging to reduce risk is demonstrated. Real examples are a from major recent planning studies.
引用
收藏
页码:887 / 893
页数:7
相关论文
共 10 条
  • [1] BJORKLUND GJ, 1987, PUBLIC UTILITIE 1015
  • [2] CROUSILLAT EO, 1989, 17 WORLD BANK EN SER
  • [3] KAHN E, 1988, ELECTRIC UTILITY PLA
  • [4] RISK AND UNCERTAINTY IN POWER-SYSTEM PLANNING
    MERRILL, HM
    WOOD, AJ
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1991, 13 (02) : 81 - 90
  • [5] CREATING DATA-BASES FOR POWER-SYSTEMS PLANNING USING HIGH-ORDER LINEAR INTERPOLATION
    MUKERJI, R
    BURKE, WJ
    MERRILL, HM
    LOVELL, B
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (04) : 1699 - 1705
  • [6] NYQUIST CE, CITED INDIRECTLY
  • [7] RAU N, 1989, UNCERTAINTIES RISKS
  • [8] LEAST-COST PLANNING - ISSUES AND METHODS
    SCHWEPPE, FC
    MERRILL, HM
    BURKE, WJ
    [J]. PROCEEDINGS OF THE IEEE, 1989, 77 (06) : 899 - 907
  • [9] SCHWEPPE FC, 1987, 9TH P POW SYST COMP
  • [10] 1990, VATTENFALL 1989 ANN