共 15 条
- [1] BAKER KR, 1978, MANAGEMENT SCI, V16, P1710
- [2] BITRAN GR, 1981, MANAGE SCI, V28, P1174
- [4] DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1971, 18 (01): : 12 - 20
- [6] Geoffrion A., 1974, MATH PROGRAMMING STU, V2, DOI [10.1007/BFb0120690, DOI 10.1007/BFB0120686]
- [7] Held M., 1974, Mathematical Programming, V6, P62, DOI 10.1007/BF01580223
- [8] Held M, 1971, MATHEMATICAL PROGRAM, V1, P6, DOI [DOI 10.1007/BF01584070, 10.1007/BF01584070]
- [9] THE DETERMINISTIC DYNAMIC PRODUCT CYCLING PROBLEM [J]. OPERATIONS RESEARCH, 1985, 33 (02) : 326 - 345
- [10] EFFICIENT ALGORITHM FOR MULTI-ITEM SCHEDULING [J]. OPERATIONS RESEARCH, 1971, 19 (04) : 946 - &