共 25 条
[11]
JAGANNATHAN R, 1973, MANAGE SCI, V19, P1295
[12]
PLANNING HORIZONS FOR PRODUCTION SMOOTHING WITH DETERMINISTIC DEMANDS .1. ALL DEMAND MET FROM REGULAR PRODUCTION
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:110-125
[13]
GENERAL PLANNING HORIZONS FOR PRODUCTION SMOOTHING WITH DETERMINISTIC DEMANDS .2. EXTENSIONS TO OVERTIME, UNDERTIME, AND BACKLOGGING
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1974, 20 (07)
:1037-1046
[14]
LAMBRECHT M, 1976, CAPACITY CONSTRAINED
[15]
BOUNDED PRODUCTION AND INVENTORY MODELS WITH PIECEWISE CONCAVE COSTS
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (03)
:313-318
[17]
NEWSON PE, 1975, MANAGE SCI, V21, P1186
[18]
SAWAKI K, 1971, J OPER RES SOC JPN, V14, P1
[20]
SILVER EA, 1973, PRODUCTION INVENTORY, V14, P64