JOINT LOT SIZING AND SCHEDULING OF MULTIPLE ITEMS WITH SEQUENCE-DEPENDENT SETUP COSTS

被引:19
作者
DILTS, DM [1 ]
RAMSING, KD [1 ]
机构
[1] UNIV OREGON,GRAD SCH,EUGENE,OR 97401
关键词
D O I
10.1111/j.1540-5915.1989.tb01400.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:120 / 133
页数:14
相关论文
共 24 条
[1]  
Aras O. A., 1982, J OPERATIONAL MANAGE, V2, P177
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[3]  
Berry W. L., 1972, PRODUCTION INVENTORY, V13, P19
[4]  
Biggs J. R., 1979, Decision Sciences, V10, P96, DOI 10.1111/j.1540-5915.1979.tb00010.x
[6]  
Blackburn J. D., 1980, Decision Sciences, V11, P691, DOI 10.1111/j.1540-5915.1980.tb01170.x
[7]   PRODUCTION AND SALES PLANNING WITH LIMITED SHARED TOOLING AT THE KEY OPERATION [J].
BROWN, GG ;
GEOFFRION, AM ;
BRADLEY, GH .
MANAGEMENT SCIENCE, 1981, 27 (03) :247-259
[8]  
Conway R, 1967, THEORY SCHEDULING
[9]  
Dixon P, 1981, J OPERATIONS MANAGEM, V2, P23
[10]  
EILON S, 1969, MANAGE SCI B-APPL, V15, pB267