JOINT LOT SIZING AND SCHEDULING OF MULTIPLE ITEMS WITH SEQUENCE-DEPENDENT SETUP COSTS

被引:19
作者
DILTS, DM [1 ]
RAMSING, KD [1 ]
机构
[1] UNIV OREGON,GRAD SCH,EUGENE,OR 97401
关键词
D O I
10.1111/j.1540-5915.1989.tb01400.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:120 / 133
页数:14
相关论文
共 24 条
[11]   EXTENSIONS OF PLANNING HORIZON THEOREM IN DYNAMIC LOT SIZE MODEL [J].
EPPEN, GD ;
GOULD, FJ ;
PASHIGIAN, BP .
MANAGEMENT SCIENCE SERIES A-THEORY, 1969, 15 (05) :268-277
[12]   DYNAMIC ASPECTS OF A PRODUCTION SCHEDULING PROBLEM [J].
FARN, CK ;
MUHLEMANN, AP .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1979, 17 (01) :15-21
[13]  
FERRERIA SE, 1973, AIIE T, V5, P237
[14]   SCHEDULING PARALLEL PRODUCTION LINES WITH CHANGEOVER COSTS - PRACTICAL APPLICATION OF A QUADRATIC ASSIGNMENT-LP APPROACH [J].
GEOFFRION, AM ;
GRAVES, GW .
OPERATIONS RESEARCH, 1976, 24 (04) :595-610
[15]   A REVIEW OF PRODUCTION SCHEDULING [J].
GRAVES, SC .
OPERATIONS RESEARCH, 1981, 29 (04) :646-675
[16]  
LITTLE JDC, 1963, OPER RES, V11, P979
[17]   SCHEDULING PROBLEM INVOLVING SEQUENCE DEPENDENT CHANGEOVER TIMES [J].
LOCKETT, AG ;
MUHLEMANN, AP .
OPERATIONS RESEARCH, 1972, 20 (04) :895-+
[18]   PLANNING HORIZONS FOR DYNAMIC LOT SIZE MODEL - ZABEL VS PROTECTIVE PROCEDURES AND COMPUTATIONAL RESULTS [J].
LUNDIN, RA ;
MORTON, TE .
OPERATIONS RESEARCH, 1975, 23 (04) :711-734
[19]  
MEIER RC, 1982, CASES PRODUCTION OPE
[20]  
NETER J, 1974, APPLIED LINEAR STATI