CONSTRUCTION AND INITIAL OPERATION OF THE ADVANCED TOROIDAL FACILITY

被引:20
作者
LYON, JF
BELL, GL
BELL, JD
BENSON, RD
BIGELOW, TS
CHIPLEY, KK
COLCHIN, RJ
COLE, MJ
CRUME, EC
DUNLAP, JL
ENGLAND, AC
GLOWIENKA, JC
GOULDING, RH
HARRIS, JH
HILLIS, DL
HIROE, S
HORTON, LD
HOWE, HC
ISLER, RC
JERNIGAN, TC
JOHNSON, RL
LANGLEY, RA
MENON, MM
MIODUSZEWSKI, PK
MORRIS, RN
MURAKAMI, M
NEILSON, GH
NELSON, BE
RASMUSSEN, DA
ROME, JA
SALTMARSH, MJ
THOMPSON, PB
WADE, MR
WHITE, JA
WHITE, TL
WHITSON, JC
WILGEN, JB
WING, WR
机构
[1] MARTIN MARIETTA ENERGY SYST INC,DIV COMP & TELECOMMUN,OAK RIDGE,TN
[2] MARTIN MARIETTA ENERGY SYST INC,DIV ENGN,OAK RIDGE,TN
来源
FUSION TECHNOLOGY | 1990年 / 17卷 / 01期
关键词
D O I
10.13182/FST90-A29169
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The Advanced Toroidal Facility (ATF) torsatron was designed on a physics basis for access to the second stability regime and on an engineering basis for independent fabrication of high-accuracy components. The actual construction, assembly, and initial operation of ATF are compared with the characteristics expected during the design phase.
引用
收藏
页码:33 / 50
页数:18
相关论文
共 32 条
[31]  
SHAING KC, 1989, 7TH P INT WORKSH STE
[32]  
WHITE TL, 1987, 6TH P JOINT WORKSH E, P377